Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    140th Canton Fair: Green Innovation Drives China’s Contribution to a Low-Carbon Future

    October 20, 2026

    Can we produce low-cost omega-3s without relying on fish?

    October 19, 2026

    LBT Unveils New 30 MeV Medical Cyclotron Platform at EANM 2026

    October 19, 2026
    Facebook X (Twitter) Instagram
    MEA News HubMEA News Hub
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    MEA News HubMEA News Hub
    Home » Gotion Secures 75% of Saudi Arabia’s First Utility-Scale BESS Tender
    PR Newswire

    Gotion Secures 75% of Saudi Arabia’s First Utility-Scale BESS Tender

    September 28, 2026
    Facebook Twitter Pinterest LinkedIn Reddit WhatsApp Email

    Chinese battery maker takes 75% of capacity with 25-year system life and desert-engineered storage technology.

    RIYADH, Saudi Arabia, Sept. 28, 2026 /PRNewswire/ — Saudi Power Procurement Company (SPPC) has awarded China’s Gotion High-Tech 6 GWh in the kingdom’s first utility-scale battery storage program—about 75% of the total tender, signaling how seriously Saudi Arabia is pursuing its 2030 energy transition goals. The G1 project totals 2 GW/8 GWh and is valued at roughly $1.16 billion. Gotion secured all three core sites—Al Muwayah, Haden and Al Kahafa—each 500 MW/2 GWh, making it the largest single technology supplier.

    The contract marks the first international large-scale deployment of Gotion Grid, its utility-scale storage system. Gotion says its edge is not price but engineering for extreme conditions. The system operates from -30°C to 55°C, uses a desert-optimized thermal management system that maintains full output during sandstorms and cuts high-temperature degradation by 40% versus conventional systems. It offers a 25-year design life, 25% longer than the industry average of 15–20 years, eliminating mid-life equipment replacement—a key factor for BOO contracts requiring 20-plus years of operation. An AI-powered battery management system enables intelligent dispatch, proactive safety warnings and full lifecycle diagnostics. All three sites can be remotely operated and integrated into Saudi Arabia’s 380 kV backbone grid.

    For investors, the award signals three shifts. Saudi storage procurement is moving faster than expected; G1 is awarded and G2 is underway, positioning Gotion for further phases. Competition is increasingly focused on lifecycle economics and extreme-environment performance over upfront pricing. Gotion is also building a regional footprint: roughly 9 GWh across the Middle East and North Africa, including a 1.5 GWh BESS in Egypt with a planned 3 GWh local manufacturing base, and a 1.2 GWh Morocco project with ACWA Power. Globally, its cumulative system-level storage projects exceed 10 GWh, including a 281 MW/843 MWh solar-storage project in Australia under construction and expected to reach commercial operation in 1H 2027.

    The Saudi award does not appear to be a one-off. As renewable penetration rises and grid stability becomes a priority, G1’s technical standards are likely to carry weight in future tenders. The question for Gotion is whether it can convert its early lead into sustained regional market share.

    Cision View original content:https://www.prnewswire.co.uk/news-releases/gotion-secures-75-of-saudi-arabias-first-utility-scale-bess-tender-302891502.html

    Share. Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Email

    Related Posts

    140th Canton Fair: Green Innovation Drives China’s Contribution to a Low-Carbon Future

    October 20, 2026

    Can we produce low-cost omega-3s without relying on fish?

    October 19, 2026

    LBT Unveils New 30 MeV Medical Cyclotron Platform at EANM 2026

    October 19, 2026

    Hantec Trader becomes RZR Funded as firm enters new phase of growth

    October 19, 2026

    Tianneng Unveils Multi-Chemistry Battery Portfolio, Advances Localized New Energy Ecosystem

    October 19, 2026

    Binance Launches Binance AI Pro, Bringing Conversational AI Strategy Building to Users

    October 19, 2026
    Latest News
    News

    Earthquake of magnitude 5.6 hits Pakistan’s Balochistan province

    October 19, 2026

    – An earthquake of magnitude 5.6 hit Pakistan’s Balochistan province on Saturday, October 17, with its epicentre near the city of Khuzdar. The German Research Centre for Geosciences reported the tremor and said it occurred at a depth of 10

    Guterres warns a million species at risk ahead of COP17

    October 17, 2026

    Oil prices hit $110 a barrel on Middle East supply fears

    October 17, 2026

    Samsung charts next-generation memory path for AI systems

    October 16, 2026

    Egypt remittances hit record $33.9 billion in eight months

    October 16, 2026

    Thailand flooding leaves 71 dead and millions affected

    October 13, 2026

    Meta rolls out Muse Wonder models for agentic AI tasks

    October 13, 2026

    WHO sets global 24-hour target for emerging health threats

    October 13, 2026
    © 2026 MEA News Hub | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.